Product
Autodesk Forma Takeoff
About
Cloud-based quantity takeoff and estimation tool within Autodesk Construction Cloud for extracting accurate material and labor quantities from 2D drawings and 3D BIM models. Supports automated measurement and customizable templates.
How teams use it
By audience
- Estimator
- Perform 2D and 3D quantity takeoffs directly on uploaded drawings and models
- Organize takeoff items into packages and classification systems for consistent bidding
- Automate quantity extraction from 3D model geometry to reduce manual measurement time
- Feed takeoff quantities directly into cost estimation and budget workflows in ACC
- Collaborate with the project team using a shared cloud takeoff environment
- Project Manager
- Review takeoff quantities to validate budget assumptions and scope changes
- Track package-level quantity data tied to project phases and cost codes
- Use ACC integration to keep takeoff data synchronized with project financials
- Construction Management
- Estimators and preconstruction teams run 2D takeoffs on drawings and 3D quantity takeoffs from Revit/BIM models stored in ACC to produce accurate bid quantities
- Uses takeoff packages and customizable templates to standardize measurement output (counts, lengths, areas, volumes) across estimators on a project
- Generates material and labor quantities that feed cost estimates and subcontractor scope, reducing manual re-measurement and quantity errors
- Works inside Autodesk Construction Cloud's common data environment so GCs, estimators, and design teams reference the same coordinated model and document set
- Exports quantities to Excel or pushes packages to EC3 for embodied-carbon analysis and to Autodesk Build for downstream cost/construction workflows
- Executive Leadership
- Access aggregate quantity and cost data across projects through ACC reporting
- Make go/no-go decisions on bids using data-driven quantity summaries
By phase
- Pre-Construction
- Primary use phase: estimators perform quantity takeoff from 2D sheets and 3D models to build the bid and budget
- Quantifies entire Revit models hosted in ACC for fast, model-based QTO during estimating and bid preparation
- Standardizes takeoff with reusable templates and packages so multiple estimators produce consistent quantities for a tender
- Links quantities into cost estimating and EC3 carbon analysis to compare design options before committing to construction
- Keeps takeoff data tied to the latest design documents in Forma Data Management, so quantities update as preconstruction drawings revise
- Construction
- Re-runs takeoffs against updated drawings and revised models to track quantity changes during construction
- Provides verified material quantities for procurement, buyout, and subcontractor scope validation as work proceeds
- Shares takeoff packages with Autodesk Build so field and project teams reconcile installed quantities against the estimate
- Supports change-order and scope-gap analysis by re-measuring affected areas when designs are revised mid-project